Even more parts to our WurliTzer in storage in the basement
in Yarmouth, Massachusetts. |
|
|
Brian Daggett, Steve Fitzgerald and Steve Fisher moving
more parts from the basement. Never thought they would ever get
done. |
A Marimba harp on wheels ready for the trip to the truck. |
|
|
The guys moving one of the two blowers that make it all
come together. |
Steve Fisher hopes we have enough room for all these "parts"
in the 24 foot truck. |
|
|
Now its time to meet the guys that made it all possible,
the backs that lifted every part of the organ. Please join me
in thanking from left to right: Brian Daggett, Steve Fitzgerald,
Steve Fisher, Gary Bergmark, and Bruce Hannover. |
After many hours of southward travel, with one stop in
Virginia because of a snowstorm. The truck broke down on Florida's
Turnpike at 3:00 am. Finally after repairs where made, the truck
and WurliTzer Opus # 1623 arrived at the loading dock of the
Amaturo Theatre at about 1:30 pm, with a very tired driver and
his navigator. |
|
|
|
Problems?
email the webmaster
|
|
Home Installation 1
Home at last Restoration |
This web site was Produced
by
L8ron
Graphix
|
|